The cabinets for the kitchen are built, the drawers are built and mounted on Bluhm drawer slides – “all” that remains is to make the cabinet doors and drawer fronts, which I plan to make in August. The studio fireplace got off to a good start and the site got cleaned up and prepared for continued building of the walls.