Prep for concrete slab and kitchen cabinets

After a quiet Memorial weekend the team is back working on the preparation for the concrete slab. Now we are chasing to be able to have a floor to work from and also to enable the fire place builder to get started. Meanwhile I am “slaving” away in the garage, building my kitchen cabinets. Three are built, five more to go, but they are bigger. Then doors and drawers have to be built, but that is not so urgent, because the cabinets can be installed without drawers and doors.