The sofa at Kafé Zolo turned out much better than I had hoped for.

After some very slow progress, at least visible, the bathroom at Villa Holsby is moving forward. Everything is ordered: shower walls, lights, tile, faucets, material for cabinets that I will build, sink, toilet, etc. The plumbing in the floor is done and I have been very fortunate with the help I am getting (plumber, electrician, tile setter, builder…). This time I am not doing so much of the actual work myself, but it still takes time to arrange everything, make plans and drawings and so on.