Bathroom progress

Not much of interest is happening in the studio right now. I am basically occupied with the bathroom renovation.

Mattias from Höganäs Golv & Kakel helped me fix the walls. Great job!

My great electrician Magnus Hult installed electric floor heating cables and then Benjamin and Mattias worked on the floor in preparation for the tiles.

I am working on the cabinet for the sink. I am building it out of 21 mm birch plywood and IKEA drawers. The way I have designed the cabinet makes it difficult, as all joints will be visible and a 1 mm mistake will be visible. But it is fun work. Easier than painting…

Leave a Reply

Archives
Search