Slow and not so slow

After we got our concrete floor it has been quiet at the site – Dave Bodelson has too many jobs and too few guys. Hopefully there will be action soon, we want full height walls so we can put a roof on it all. In the meantime other things are happening, such as digging trenches for cables to the solar panels, deciding how the corbels should look, building cabinets and drawers for the kitchen. All cabinets are built and now I am making all the drawers, got the first “prototype” built with a bit of trial and error. The first drawer came out ok, the next seven will be easier to build now that I know how.

sfstudio37

solar1

sfstudio38

sfstudio39

Leave a Reply

Archives
Search